Pre-Assembly
FB150 Assembly Pack Checklist
Assembly
FB150 Step-by-Step Assembly Instructions
1. Front Stabilizer and Rear Stabilizer
Hardware Needed for This Step | |
#13 | Curved Washers (4 pcs) |
#14 | Domed Nuts (4 pcs) |
a. Pull out the lock pin (11) from the main frame (01) and adjust main frame (01) to the correct position then insert lock pin (11) to tighten the main frame (01).
b. Attach the front stabilizer tube (has wheels) (05) to the main frame (01), tighten with 2 curved washers (#13) and 2 domed nuts (#14).
c. Repeat the procedure for rear stabilizer tube (06).
2. Pedals
Hardware Needed for This Step | |
#16 | Flat Washers (3 pcs) |
#17 | Nylon Nuts (3 pcs) |
a. Connect the left and right pedal (09L) & (09R) to their appropriate crank arm (15). The right pedal is on the right hand side of the cycle as you sit on it.
b. The left pedal should turn towards the front of the machine (counterclockwise) when screwing them on.
c. Note that the right pedal (09R) should be threaded on clockwise and the left pedal (09L) on counter-clockwise.
3. Seat
a. Screw off 3 flat washers (#16) and 3 nylon nuts (#17) the back of seat (07). Attach the seat (07) to the seat post tube (03), tighten with 3 flat washers (#16) and 3 nylon nuts (#17).
b. Insert the seat support tube (03) to the main frame (01), fasten with a club knob (#10).
4. Handlebar
a. Remove 2 Allen screws (12) from main frame (01). Attach the handlebar (04) to main frame (01) tighten with 2 Allen screws (12).
5. Console
a. Insert the computer wire (8) into the handlebar (4), connect the middle sensor wire (19) with the computer (08).
b. Plug hand pulse wire (18) into the back of computer (8).
Comments
0 comments
Please sign in to leave a comment.